Fraser Flats Road and Crossing Design

  • Client Name: Carrier Lumber
  • Project Name: Fraser Flats Road and Crossing Design
  • Location: British Columbia
  • Sector: Transportation Forestry
  • Timeline Start: December 31, 2014
  • Timeline End: December 31, 2018

This project was completed for Carrier Lumber from 2015 – 2019. The scope of work included design and certification of 24 km of forestry access road including 14 major stream crossings and a CN railway crossing. The project required unique design solutions as the road alignment passed through a number of Old Growth Management Areas (OGMA).

Engineering Services

  • Concept Road and Bridge Designs
  • Alignment Selection
  • Geometric Road Design
  • Detailed Bridge Design
  • Forestry
  • Access Management
  • Old Growth Areas Management